• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Index-Cont. - 14003_256
Index-Cont. - 14003_258

Aviation Boatswains Mate F - Aviation theories and other practices
Page Navigation
  237    238    239    240    241  242  243    244    245    246    247  
O Offloading JP-5, 4-71 offloading from service tanks, 4-71 offloading from storage tanks, 4-71 Rotary vane pump-Continued pressure control valve, 4-15 rotor and shaft assembly, 4-15 theory of operation, 4-15 troubleshooting, 4-16 P S Personnel Qualification Standards, 1-4 Pipe patches, 2-14 Planned Maintenance System, 2-35 Pollution control, 4-73 Pressure fueling nozzle, 5-13 Pressure gages, 4-48 Pump couplings, 4-16 falk steelflex, 4-17, lovejoy, 4-18 rex chain, 4-18 Q Quality assurance program, 2-36 Quality surveillance, 3-5 limits of contamination, 3-6 samples, 3-11 Quick-disconnect coupling, 5-13 R Receiving JP-5 aboard ship, 4-62 deballasting and stripping, 4-62 filling sequence, 4-63 internal transfer, 4-63 preparations, 4-63 receiving operation, 4-64 Refractometer, 3-22 Refueling hand signals, 5-18 Relaxation chambers, 7-3 Rotary vane pump, 4-13 cylinder and head assembly, 4-15 maintenance, 4-15 Service system operations, 4-72 Settling and stripping, 4-67 settling period, 4-67 stripping procedure, 4-67 stripping schedule, 4-67 Sounding tanks, 4-60 Spray (flange) shields, 4-27 Storage tanks ashore, 7-5 Surveys, 8-6 T Tank level indicators, 4-53 Tanks aboard ship, 4-48 contaminated tanks, 4-52 deep centerline tanks, 4-49 double-bottom tanks, 4-49 nest of tanks, 4-51 overflow tank, 4-51 peak tanks, 4-49 service tank, 4-49 storage tank, 4-49 wing tanks, 4-48 Technical/maintenance manuals, 8-1 Tools, 2-1 hand tools, 2-1 portable power tools, 2-22 precision measuring tools, 2-23 Transfer lines ashore, 7-5 Transfer system operations, 4-68 consolidating fuel, 4-70 INDEX-3







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.