• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ASSIGNMENT 8-Cont. - 14017_290
ASSIGNMENT 9-Cont. - 14017_292

Aviation Storekeeper 3 - Aviation theories and other practices - index
Page Navigation
  268    269    270    271    272  273  274    275    276    277    278  
ASSIGNMENT 9 Textbook Assignment: “Supply Support,” chapter 9, pages 9-1 through 9-20. 9-1. For validations and reference purposes on NALCOMIS input transactions,    output reports, and screen displays,   what type of data elements are used? 1. Abbreviated 2. Laminated 3. Dynamic 4. Static 9-2. Dynamic data elements are added to NALCOMIS records in which of the following ways? 1. By personnel downloading the change notice tapes only 2. By the supply officer during initial installation of the system only 3. By the system coordinator on a monthly basis only 4. By all authorized personnel during normal operations and on-line transaction processing 9-3. In NALCOMIS, a password is processed in such a way that the system recognizes what information about the user? 1. The user’s organization 2. The user’s work center 3. The user’s special maintenance qualifications 4. All of the above 9-4. An AK assigned to ASD/SSC must follow the aviation maintenance policies and procedures outlined in which of the following publications? 1. 2. 3. 4. 9-5. The The NAMP manual The AVDLR The MILSTAMP The NAVOSH manual meetings between supply and maintenance representattives to discuss high priority requisitions should be held at least how often? 1. Annually 2. Quarterly 3. Monthly 4. Weekly 9-6. 9-7. 9-8. 9-9. 9-10. 9-11. 9-12. Which of the following items is NOT a special material management program? 1. AVDLR 2. ATAC DLR 3. IRIM 4. DBOF Under the fixed allowance concept, additions to the allowance must be authorized by what activity? 1. IMA 2. ICP 3. FISC 4. NAS Unless otherwise authorized, requisitions for AVDLR items should NOT be passed off-station before the defective turn-in item is in what status? 1. AWP 2. EXREP 3. BCM 4. RFI Requisitions for AVDLR items may be passed off-station if the NSN of the item is contained in what listing? 1. The IMRL 2. The CRIPL 3. The NMCS/PMCS 4. The ML-C What fund is used to finance AVDLR items? 1. IRIM 2. OSI 3. DBOF 4. LRCA As compared to other programs, the AVDLR program provides which of the following advantages? 1. Reduced back orders 2. Improved financial flexibility 3. Improved aircraft readiness 4. All of the above What Record Type code identifies material issues? 1. 60 2. 61 3. 62 4. 63 47







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.