• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
OPERATION - 14020_171
Periodic Inspection

Aviation Structural Mechanic E2 - How airplanes are built and how to maintain them
Page Navigation
  151    152    153    154    155  156  157    158    159    160    161  
Figure 5-9 shows the operating instructions from the plate attached to the trailer. When the servicing trailer is received from the factory or from an overhaul activity, it is normally ready to be filled with LOX and pressurized for immediate use. The annular space is evacuated to the point desirable for a warm and empty tank. Prior to filling or pressurizing the tank, perform the inspection procedures indicated in table 5-1. Filling.— Normally the servicing-trailer is filled from central supply tanks. These tanks have transfer hoses terminating in couplings that match the fill-drain line coupling on the trailer. Operation of the supply tank should be in accordance with the procedures in its operation manual. Filling consists of the following procedures. Ensure that all required safety equipment is in use and all safety precautions have been taken. Place Figure 5-9.—Operating instructions for TMU-70/M. 5-8







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.