9-51.
When DCU receives an RFI item from
IMA, what Conversation code do they
use to generate an issue document?
1.
N621
2.
N631
3.
N644
4.
N651
9-52.
The procedures for the
establishment of retail requirement
levels for consumable and
repairable items afloat are
contained in what instruction?
1.
OPNAVINST 4790.2
2.
NAVSUPINST 4440.115
3.
FASOINST 4440.15
4.
OPNAVINST 5510.1
9-53.
What organization may authorize a
redistribution of the OSI/fixed
allowance assets of aviation items
stocked by an activity?
1.
NAS
2.
FISC
3.
ASO
4.
NAVSUP
9-54.
Redistribution of the aviation
OSI/fixed allowance assets of an
activity can be ordered by an ICP
to fill requisitions with what
issue priority?
1.
Priority 1
2.
Priority 2
3.
Priority 3
4.
Priority 4
9-55.
What NAVSUP form is used to request
changes in the fixed allowance of
ASO managed items?
1.
766
2.
801
3.
1250
4.
1375
9-56.
When the constrained TAT is
computed for allowances, what
maximum time is allowed for AWP?
1.
10 days
2.
15 days
3.
20 days
4.
30 days
9-57.
What ASD/SSC unit is responsible
for processing all repairable items
returned from the IMA?
9-58.
What instruction contains
information on the identification
and disposition of repairable
aircraft tires?
1.
OPNAVINST 4790.2
2.
FASOINST 13490.3
3.
FASOINST 4440.15
4.
OPNAVINST 5510.1
9-59.
Field level repairable items have
an SM&R code that limits their
restoration to RFI in what level of
maintenance?
1.
Organizational
2.
Intermediate
3.
Depot
4.
Contract support
9-60.
The ASD/SSC is holding an EI/QDR
exhibit awaiting disposition
instructions. According to
OPNAVINST 4790.2, what maximum
number of days should ASD/SSC hold
the exhibit before performing the
next action?
1.
7 days
2.
15 days
3.
20 days
4.
30 days
9-61.
The material for an EI/QDR exhibit
is assigned what Condition code?
1. A
2. F
3. L
4. H
9-62.
The shipping documents for material
exhibits must be stamped with EI!
or QDR.
What is the prescribed
size of the lettering?
1.
1 in.
2.
2 in.
3.
3 in.
4.
4 in.
9-63.
What ASD/SSC unit is responsible
for receiving, storing, and
controlling all AWP components
returned from IMA?
1.
SLU
2.
DCU
3.
SSU
4.
AWP
1.
MDU
2.
PEB
3.
SSU
4.
SLU
51