5-55.
What NAVAIR publication contains
assembly procedures for 5.0
rockets?
1.
11-140-5
2.
11-75A-63
3.
11-75A-54
4.
11-5A-17
5-56.
What NAVAIR publication contains
assembly procedures for 2.75
rockets?
1.
11-75A-61
2.
11-75A-57
3.
11-5A-17
4.
01-85-5
5-57.
What total number of sealing rings
are used with a SW 25 flare
dispenser?
1.
Six
2.
Two
3.
Eight
4.
Four
5-58.
The shear pin tangs on a SW 25
flare dispenser should be spread
between what specified range of
degrees?
1.
10 to 15°
2.
20 to 30°
3.
30 to 40°
4.
45 to 50°
5-59.
The outside of a flare dispenser
should be marked with all EXCEPT
which of the following information?
1.
Time loaded
2.
Date loaded
3.
Lot number
4.
Electrical test date
5-60.
What authority must authorize
changes to ordnance?
1.
NAVSEASYSCOM
2.
NAVAIRSYSCOM
3.
CINCLANTFLT
CNO
4.
23