4-59.
Before reassembling a sewing machine,
what do you use to smooth rusty parts?
1.
Sand paper
2.
Rubbing compound
3.
Emery paper
4.
Grinding compound
4-60.
When reassembling a sewing machine,
what part should you install first?
1.
Arm shaft
2.
Hook drive shaft
3.
Bobbin case opener
4.
Hook saddle assembly
4-61.
When the bobbin case opener is properly
installed, it is in what position?
1.
The curved end points toward the
bobbin case
2.
The curved end points away from
the bobbin case
3.
The blunt end points toward the
bobbin case
4.
The blunt end points away from
the bobbin case
4-62.
What total number of spline grooves are
on a hook driving shaft?
1.
Five
2.
Six
3.
Seven
4.
Eight
4-63.
On the hook driving shaft, the end with
a spline is installed first into the
right hook driving shaft bearing.
4-64.
When you are replacing the feed-driving
eccentric, which of the following
statements is true?
1.
The oiling felt faces down and the
crank toward the operator
2.
The oiling felt faces up and the
crank toward the operator
3.
The oiling felt faces up and the
crank away from the operator
4.
The oiling felt faces down end the
crank away from the operator
4-65.
When you are installing the hook driving
shaft lock ratchet, the flange and
setscrews face the left of the machine.
1.
True
2.
False
4-66.
Before you insert the needlebar rock
frame assembly, the needlebar connecting
link must be at its lowest position.
1.
True
2.
False
4-67.
When installing the presser bar into the
machine head, you should insert it
through the upper bushing about
1. 1
inch
2. 2
inches
3. 3
inches
4.
3 1/2 inches
1.
True
2.
False
20