CHAPTER 9
CONTROL TOWER OPERATIONS
ASSIGNMENT QUESTIONS
9-1.
How long must flight progress strips be retained before they can be destroyed?
A.
1 month
B.
3 months
C.
6 months
D.
12 months
9-2.
When should flight progress strips be retained longer than the minimum
requirement?
A.
Until annual facility certification inspection is complete
B.
Strip contains information on an aircraft involved in an accident
C.
Strip contains information on an aircraft penetrating the North American
ADIZ
D.
Until the Air Traffic Activity Report is submitted
9-3.
Who is responsible for formulating and issuing ground movement clearances?
A.
Tower supervisor
B.
C.
Flight data
D.
Local control
9-4.
Who is responsible for preparing and posting flight progress strips?
A.
Tower supervisor
B.
C.
Flight data
D.
Local control
9-5.
Who is responsible for formulating and issuing control instructions to maintain
separation between aircraft operating under the jurisdiction of the tower?
A.
Tower supervisor
B.
C.
Flight data
D.
Local control
ASSIGNMENT Questions-71