Quantcast Categories of Repairable

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Custom Search
 
  
beyond the repair capability of the organizational (O-level) or intermediate (I-level) maintenance levels. The DLRs in Not Ready For Issue (NRFI) condition must be shipped to the dept level maintenance activity for repair or disposition. The DLRs are identified by MCCs E, G, H, Q, or X (with the exception of cognizance 6RX). Advanced technology has made the weapons systems more sophisticated. The equipment, components, and related parts necessary to sustain the weapons systems also have become more complex and specialized. The weapons replaceable assembly (WRA) is the generic term that includes all replaceable packages of an avionic equipment or system as installed in the aircraft weapons system. The WRA does not include cable assemblies, mounts, fuse boxes, or circuit breakers. The WRA is composed entirely of shop replaceable assemblies (SRAs). The shop replaceable assembly (SRA) is a generic term that includes all the packages in the WRA. The SRAs include the chassis and wiring as a unit. NOTE: An SRA may be made of other SRAs. Several shop replaceable assemblies (SRAs) make up a weapons replaceable assembly (WRA). When a component fails and it is diagnosed that the cause is in an SRA, the entire SRA module containing the defective part is removed and replaced. Repairable items are expensive and normally require a long lead time in procurement. However, if the defective SRA components are repaired and returned to the supply system, the fleet can maintain its readiness. Stock records at all supply levels must reflect total quantities of all available repairable components. These quantities are reported to the NAVICPs. The report will enable the NAVICPs to have an accurate count of assets to budget for procurement and distribution. The NAVICPs also use the report to determine proper repair workload scheduling to maintain ready for issue (RR) stock levels, The item manager must keep track of both RFI and not ready for issue (NRFI) material to maintain the required quantity. The NAVICP uses this information to decide whether to buy additional quantities or repair NRFI assets to fill the requirements. Categories of Repairable Initially, an item is designated as repairable or consumable during the development of the maintenance plan by the Hardware Systems Command and implemented into the coding process during the provisioning process. This plan includes information necessary to establish the source maintenance and recoverability (SM&R) code. The maintenance plan also designates the lowest maintenance level that is authorized to perform a specific task on an item. The different maintenance levels are the organizational, intermediate, and depot level. The SM&R code reveals the maintenance level authorized to perform the following work: l l l Remove and replace the item Repair the item Condemn the item if it cannot be repaired After the repair level for an item has been designated, the item is assigned a material control code (MCC) by the item manager. The MCC is a single-letter code used for identification of repairable items, to segregate items into more manageable groups, or to relate to field activities special reporting and/or control requirements. Ownership Aviation Held Level Repairable (AVFLRs) may be carried in purpose codes W or L as authorized stock under an activity’s fixed allowance. The AVFLRs that are excess to the authorized stock levels maybe carried under purpose code A.    Afloat, AVFLRs are carried under stores account 51000 pending issue to customers. In the DLR program, ownership relates to the account under which the repairable material inventories are held. These accounts include the Defense Business Operations Fund (DBOF), Appropriation Purchase Account (APA), contractor supported, and end-use ashore/afloat. The DBOF (formerly Navy Stock Fund [NSF]) is a revolving fund with two major assets, cash and material. The DBOF cycles cash into material inventory by having the components repaired at depots, or by buying from vendors or other stores accounts. When material is received, it is placed on the shelf where it is held in Navy stock account 51000 pending requisitioning by a customer. When the material is issued to the customer, the DBOF is reimbursed by the customer’s operating funds. The DBOF recycles the cash into inventory through repair or purchases and the cycle is then repeated. The Appropriation Purchase Account (APA) material is held in Stores Amount 52000. The APA 4-2



Aviation News
ANA Holdings firms up order for A320neo Family
ANA to become first A320neo operator in Japan Share this...
airbus.com
One Year of Success with Airbus Managed Inventory for Latin America MRO Aeroman
Aeroman, an El Salvador based Maintenance Repair and Overhaul (MRO)...
airbus.com
DAC International Achieves STC on New Software Products
[Avionics Today 07-30-2014] DAC International, has received Parts Manufacturer Approval...
aviationtoday.com
Exelis Delivers Latest Electronic Warfare Technology for F/A-18s
[Avionics Today 07-30-2014] Exelis has delivered the first nine electronic...
aviationtoday.com
Flight Restrictions for African Leaders Summit
Flight restrictions in place over Washington, DC for the U.S.-African...
faa.gov
Airbus terminates purchase order with Skymark Airlines for A380s
Following discussions with Skymark Airlines and in light of the...
airbus.com
Australian Audit Office Slams MRH90 Project
The Australian Government ordered the MRH90 – an Australian variant...
aviationtoday.com
Aircraft and honey: Bees are playing a key role in “monitoring” Airbus’ environmental footprint
Airbus’ comprehensive families of market-leading widebody and single-aisle aircraft aren’t...
airbus.com
AIRBUS A350 XWB arrives in Hong Kong for NG FOR THE FIRST TIME EVER
The world’s newest, most modern and efficient aircraft, the Airbus...
airbus.com
UK MoD to Integrate New Missile System on Navy, Army AgustaWestland AW159 Wildcats
The UK Ministry of Defence (MoD) has enlisted AgustaWestland to...
aviationtoday.com
The A350 XWB embarks on final certification phase
World route proving tour to visit 14 cities Share this...
airbus.com
FAA Statement-FAA Lifts Flight Restrictions for Ben Gurion International Airport
Agency continues to monitor the very fluid situation and will...
faa.gov
FAA Statement-Notice to Airmen Extended for Ben Gurion International Airport
Yesterday's notice is still in effect for up to an...
faa.gov
Hawaiian Airlines to order six A330-800neo aircraft
First U.S. airline to join launch list for new aircraft...
airbus.com
Boeing Reports $22 Billion 2Q Revenue
[Aviation Today July 23, 2014] Boeing reported total revenue of...
aviationtoday.com
FAA Statement-Notice to Airmen Issued for Ben Gurion International Airport
U.S. airlines prohibited from flying to or from the airport...
faa.gov
A350 XWB MSN001 successfully conducted ‘Maximum Energy Rejected Take-Off’ test
Airbus has successfully performed the ‘Maximum Energy Rejected Take-Off’ (MERTO)...
airbus.com
TTTech Releases Next Generation of its TTP Controller
[Avionics Today July 21, 2014] TTTech has released the third generation...
aviationtoday.com
Exelis to Provide SANG ATM Upgrade
[Avionics Today July 21, 2014] Exelis is providing its GCA-2020...
aviationtoday.com
Ready to board: Airbus issues the latest edition of the “Shaping Efficiency” magazine
Step inside the all-new A350 XWB with Issue no. 6...
airbus.com


Privacy Statement - Copyright Information. - Contact Us

comments powered by Disqus

Integrated Publishing, Inc.
9438 US Hwy 19N #311 Port Richey, FL 34668

Phone For Parts Inquiries: (727) 755-3260
Google +