would include the months of October,
November, and December as the first
quarter.
b. Ships completing overhaul late in the
quarter are not expected to do all planned
maintenance scheduled during that quarter,
but should do a certain amount based on
the time remaining in the quarter. In this
instance, the maintenance done and the
effective dates are recorded on the back of
the Quarterly PMS Schedule, and the
schedule is marked to show that it is only a
partial quarterly PMS record.
5.
Each column represents a week and is divided
into 7 days by the use of tick marks across the
top. The first tick marked space within a
column represents Monday. Place Monday's
date for each week in the quarter on the
pedestal between each column.
6.
Lightly shade in across the tick marks the days
that the ship expects to be underway.
7.
Using both the LOEP and the Cycle PMS
Schedule, enter the MIP number including the
date code in the MIP column in a space on line
with the subject equipment on the Cycle
Schedule.
8.
From the Cycle PMS Schedule, select the
Schedule Quarter After Overhaul As Indicated
column corresponding to the quarter being
scheduled. Each of the maintenance re-
quirements listed in this column and the Each
Quarter column will be transcribed to an
appropriate weekly column of the Quarterly
PMS Schedule. If possible, do not schedule in
the last 2 weeks of the quarter. These 2 weeks
may then be used for rescheduled maintenance
requirements.
9.
Refer to the MIPs and the departmental master
deck of MRCs for a brief description of the
maintenance
actions
represented
by
the
periodicity codes on the Cycle PMS Schedule
to determine if the actions should be performed
in port or at sea. Schedule the requirements on
7-17
2000/001-A2
QUARTERLY PMS SCHEDULE (CONVENTIONAL)
OPNAV FORM 4790/14 (REV 6-73)
S/N 0107-LF-3241
WORK CENTER
YEAR
QUARTER AFTER OVERHAUL
APPROVAL SIGNATURE
DATE
RESCHEDULE
MONTH
3000/001-73
5210/009-C1
5510/018-82
5530/001-13
5530/001-13
4924/RHD-82
R-1
2M-6
M-1SAR
2W-1
3W-1
2W-1
M4R
M-2
3W-2
2W-1
M-1
A-2
M-2
M-4R
2W-1
S-3R
18M-1
3W-2
2W-1
M-1
2M-6
M-2
M-4R
3W-2
2W-1
S-2
Q-5R( Q1)
M-1M-2
M-1M-2
2W-1
M-1
M-1
M-1
Q-3
A-1
Q-2
M-2
M-2
M-1
(M-1)
M-1
R1TM
R1TM
M-4
M-2R
M-4
M-2R
M-1
M-4
M-4
M-1M-2R
A-13R
Q-3
Q-2( M-1)
S-1( R-1)
4
11
18
25
2
9
16
23
30
6
13
20
27
30MAR94
JUNE
M. M. RODENT
MONTH
MAY
MONTH
6
APRIL
94
EA07
MIP
A-13R
M-4
M-4
A-2
S-1
M-1M-2R
ABEf0711
Figure 7-11.Quarterly PMS Schedule.