2-48.
A technical directive change directs the
accomplishment and recording of a material
change, a repositioning, a modification, or
an alteration in the characteristics of the
equipment to which it applies.
1. True
2. False
2-49.
A technical directive that is issued to
clarify, add to, delete from, make a minor
requirement change, or cancel an existing
technical directive is known as what type of
technical directive?
1.
Bulletin
2. Change
3.
Revision
4. Amendment
2-50.
Which of the following symbols designates
the second revision to a TD?
1.
Rev. 1
2.
Rev. 2
3.
Rev. A
4.
Rev. B
2-51.
A technical directive is issued to correct a
safety condition that could result in fatal or
serious injury to personnel. What type of
technical directive is this?
1.
Routine
2. Immediate action
3. Urgent
4. Record purpose
2-52.
The overall management of the technical
library is a function of what activity or
individual?
1.
Quality assurance division
2. Commanding officer
3.
Central library supervisor
4. Material control division
2-53.
2-54.
2-55.
2-56.
2-57.
13
What form does the dispersed librarian sign
to indicate the receipt of a publication
change from the central library?
1. DD Form 1348
2.
NWPL (OPNAV Form 5070/11)
3.
CECR (OPNAV Form 5070/12)
4.
OPNAV Form 4790/66
Routine deficiencies in technical
publications are reported via OPNAV Form
4790/66 to what command or commands?
1.
CNO
2. NATSF only
3. CFA only
4.
NATSF and CFA
When an activity with a central library has
other libraries within the command,
dispersed technical publications libraries
(DTPLs), what organizational element of
the activity manages these libraries?
1.
The CTPL
2 .
QA
3. Admin
4. Material control
At least how often does QA audit the
CTPL?
1. Monthly
2. Quarterly
3. Biannually
4. Annually
Information about discrepancies or change
recommendations of a routine nature on the
technical content of a NATOPS should be
submitted on what form?
1.
OPNAV Form 4790/66
2.
OPNAV Form 4790/12
3.
OPNAV Form 5300/32
4.
OPNAV Form 3500/22