a mandatory government source of supply. The
mandatory sources are as follows:
Defense/federal supply systems for material
assigned an NSN
Excess personal property from other agencies
Federal prison industries
National industries for the blind or other
severely handicapped
Mandatory GSA federal
contracts
Optional GSA federal
contracts
supply schedule
supply schedule
OPEN MARKET PURCHASES
The methods for making small purchases and
corresponding dollar limitations are as follows:
Small business-small purchase set-aside. Each
purchase with small business concerns must
be ,000 or less.
Blanket purchase agreement (BPA). Each
BPA call may not exceed ,000 (except
,000 for inventory control points [ICPs])
with an unlimited amount for subsistence.
Imprest fund (IF). Each purchase using the IF
may not exceed 0.
Purchase order. Each purchase order may not
exceed ,000.
Purchase invoice. The purchase invoice
method using the Standard Form 44 may not
exceed ,500 (except ,000 for aviation fuel
and oil purchased by pilots).
SMALL PURCHASE PROCEDURES
A purchase request (PR) must be prepared and
approved before the contracting officer starts a
purchase action. A PR includes the various
MILSTRIP requisitions, a Request for Contrac-
tual Procurement, NAVCOMPT Form 2276, or
the Military Interdepartmental Purchase Request,
DD Form 448.
Purchase Request
All PRs received must be receipt dated,
screened, routed for recording, and assigned a
control or route sheet. The initial screening
includes an authorized signature; accounting
information; a priority designator and a required
delivery date; clearance and approval; and an
attached statement of work, technical specifica-
tions, drawings, or blueprints.
A final screening of all PRs is conducted by
the buyer or storekeeper for adequacy. When a
PR is determined to be inadequate, it is returned
to the originator for modification or cancellation.
Each contracting office establishes minimum
standards for requirements data that must be
included as a part of each PR before it is
considered adequate. The minimum level of
information needed to determine adequacy should
include, but not necessarily be limited to, the
following:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
Funding
Plain English (adequate purchase descrip
tion or specification or statement of work)
Part number and corresponding CAGE
code
Quantity
Required delivery date or period of per-
formance and priority designator
Place of delivery with proper consignment
instructions, if applicable
Previous buys and prices paid for the
same or similar item or, when no history
exists, a price estimate and the basis upon
which the estimate was established
Sole source justification, if required
A point of contact for technical
information
Any unique requirements such as mark-
ing, packing, or transportation account-
ing codes
Document number
Funding of Purchase Request
The estimated cost shown on the PR is the
amount committed by the requiring activity to
cover the purchase of supplies or services.
Responsibility for controlling the obligation of
funds and the limitations of such funds is vested
exclusively in the allotment holder or designated
representative. However, this does not relieve the
contracting officer from complying with purchas-
ing regulations contained in the SUPARS. The
4-2