5-43.
What is the normal maximum
allowable tanktop pressure when
filling the MOGAS tank?
1.
3 psi
2.
23 psi
3.
25 psi
4.
45 psi
5-44.
The MOGAS transfer pump is NOT to
be started if the temperature in
the discharge header exceeds how
many degrees?
1.
75°F
2.
90°F
3.
95°F
4.
100°F
5-45.
How many changes of seawater are
required to ensure proper flushing
of the MOGAS tanks?
1.
One
2. Two
3.
Three
4.
Four
5-46.
The filter/separator used on shore
activities is designed to remove
what percent of solid and water
contaminants ?
1.
98% of all solids and 98% of
all water
2.
100% of all solids and 98% of
all water
3.
98% of all solids and 100% of
all water
4.
100% of all solids and 100% of
all water
5-47.
The manual water drains on the
filter/separator are connected to
what component(s)?
1.
A recirculation line going back
into the tank
2.
A recovery system
3.
The shore activitys sewer
drain lines
4.
The fuel monitor
5-48.
Which of the following locations
requires a filter/separator?
1.
The suction side of transfer
pumps
2. The storage tank to storage
tank transfer lines
3.
The water drain line
4.
The supply piping from the
storage tanks to aircraft
refueler truck fill stands
5-49.
Fuel quality monitors have fuses
installed inside.
What part of the
fuse absorbs water?
1.
The paper pleat
2.
The sensing washers
3.
The fiberglass core
4.
The paper plug
5-50.
At least how long must fuel
maintain contact with the metal
walls of a relaxation chamber?
1.
1 min
2.
5 min
3.
30 sec
4.
45 sec
5-51.
All hoses used on shore activities
should meet which of the following
requirements?
1.
Collapsible
2.
Non-collapsible
3.
25 feet in length
4.
Equipped with a continuity wire
in the center of the hose
5-52.
The hose end pressure regulator
installed with the nozzle assembly
is set for what maximum psi?
1.
45 psi
2.
50 psi
3.
55 psi
4.
60 psi
5-53.
The loading systems on a loading
rack are approved for multiproduct
use.
1.
True
2.
False
36