1-28.
If you work in electronics, instruments, or
armament, you are normally assigned to
what division of an organizational-level
maintenance department?
1.
Aircraft
2.
Line
3. Avionics/armament
4.
Operations
1-29.
In an intermediate-level maintenance
activity, what is the central point of the
maintenance effort?
1. Maintenance material control
2. Maintenance control
3. Quality assurance
4. Production control
1-30.
Normally, the intermediate maintenance
organization has a total of how many
production divisions?
1.
Five
2.
Six
3.
Three
4. Four
1-31.
What system provides organizational and
intermediate maintenance activities with a
computer-based management information
system?
1.
NADEP
2.
NALCOMIS
3. MDS
4 . N A V S U P
1-32.
Maintenance managers need current status
information to control the maintenance
effort. What system is designed to provide
maintenance managers with this
information?
1. NMCS
2 . P M C S
3 . V I D S
4 . F M C S
1-33.
The VIDS boards in each work center are
verified with the maintenance control VIDS
board a minimum of how often?
1.
Once each shift change
2.
Twice each day
3.
Once each day
4.
Once each week
1-34.
After the personnel in maintenance control
complete the required blocks of a newly
initiated VIDS/MAF, copies 1 and 5 are
forwarded to
1. quality assurance
2. material control
3. production control
4. the work center
1-35.
If a check flight is required after the
completion of a corrective action,
notification must be given to what
individual?
1.
The quality assurance division officer
2.
The material control supervisor
3.
The maintenance material control
officer
4.
The aircraft maintenance officer
1-36.
After a discrepancy has been corrected,
what should be done with copies 1 and 5 of
the VIDS/MAF?
1.
2.
3.
4.
Copy 1 should be sent to quality
assurance, and copy 5 is placed in the
work center files
Copy 1 should be sent to maintenance
control, and copy 5 is sent to quality
assurance
Copy 1 should be sent to maintenance
control, and copy 5 is placed in the
work center files
Copy 1 should be placed in the work
center tiles, and copy 5 is sent to
maintenance control