3-74.
What is the nominal peak power
level of the RF pulses from the
switch-amplifier to the difference
antenna pattern?
3-75.
When the TEST-CHAN CC switch is set
to TEST on the C-7383/APX-76A(V)
interrogator control box, what
signal is modified in the IFF
system to place the zero-range
replies at approximately 4 nautical
miles on the radar display?
1. 1 kW
2. 2 kW
3. 6 kW
4. 8 kW
1.
Normal suppression
2.
ISLS
3. RSLS
4.
Trigger timing
22