Q13-3. What is the lifting capability of the
To remain certified, crash cranes are required to
A/S32A-36A hoist, at 13.5 feet clear outreach
have an annual load test. Your load test date should be
and 33 feet of hook height?
scheduled just prior to deployment. An aircraft crash
crane that exceeds its certification period while on
1.
60,000 lb
deployment would create an embarrassing and
2.
70,000 lb
dangerous situation for the ship. For this reason, you
3.
80,000 lb
must ensure all scheduled maintenance is performed on
4.
90,000 lb
time and that all required certifications are scheduled so
Q13-4. From which of the following sources does the
that they will stay current throughout the deployment.
dc electric drive motor on the AACC boom
Q13-1. What model of crash crane would be used
receive its power?
onboard an aircraft carrier?
1.
The motor drive cabinet (MDC)
1.
The A/S32A-35A CVCC
2.
The batteries
2.
The A/S32A-36A AACC
3.
The operator's cab
3.
The A/S32A-37A CVCC
4.
4.
The A/S32A-38A AACC
Q13-5. When should a load test for the crash cranes
Q13-2. The A/S32A-36A crane's ac generator can
be scheduled?
produce how much voltage?
1. After major repairs have been performed
1.
100 volts
on the crane only
2.
250 volts
2. Once every 3 years
3.
380 volts
3. Once every 2 years or after major repairs
4.
440 volts
4. Annually, after repair or replacement of a
major component and prior to a deploy-
ment
UPPER
PROPORTIONING
SYSTEM ACCESS
MAIN
CONTROL
PANEL
LIFTING/TIEDOWN
TURRET
HYDRAULIC TANK
FILL (2)
DIESEL
ENGINE
COMPARTMENT
PORTABLE
KNEEL
PLATE
BOTTLES (3)
WATER TANK FILL
HANDLINE HOSE REEL
AFFF TANK FILL
REAR
ENGINE
WATER TANK FILL (QUICK FILL)
ACCESS
DOORS
NURSING
CONNECTION
TIEDOWNS
RIGHT SIDE
ENGINE ACCESS DOOR
AMf13004
FILTER
ACCESS
DOOR
BATTERIES
Figure 13-4.--A/S32P-25 fire-fighting truck.