Before fuel can be pumped Into any
tank in a nest of storage tanks,
what condition must be met?
1.
The service tanks must be full
2.
The fuel must be purified
3. The overflow tank for that nest
must be empty
4.
All other tanks in that nest
must be empty
Typically, what is the minimum
number of tanks that should be open
when receiving fuel?
1.
Six
2. Two
3.
Eight
4.
Four
Which of the following is NOT a
consideration when you are
determining the duration of a
receiving operation?
1.
Speed of the ship
2.
Amount to be received
3. Pumping rate of the tanker
4.
Maximum receiving rate
Underway refueling stations should
be manned at least how many minutes
before the fueling time?
1.
15 min
2.
30 min
3.
45 min
4.
60 min
Which tanks are normally filled
first during a refueling operation?
1.
Double-bottom
2.
Wing
3.
Service
4.
Overflow
Where is the initial flow of JP-5
directed during an underway
replenishment?
1.
Service tanks
2.
Peak tank
3.
Contaminated settling tanks
4-36.
Overflow mains leading into
overflow tanks are designed to
allow what flow rate of overflow
into overflow tanks?
1.
1,000 gpm
2.
1,500 gpm
3.
2,000 gpm
4.
2,500 gpm
4-37.
After the initial samples are
obtained, how often are samples
taken when on-loading fuel?
1.
Every 15 min
2.
Every 20 min
3.
Every 30 min
4.
Every 60 min
4-38.
A fuel sample fails to meet the
cleanliness requirements during a
refueling operation.
Who makes the
final decision on acceptance or
rejection of the fuel?
supervisor
1. The person taking the sample
2. The quality surveillance lab
3. The division officer
4. The commanding officer
4-39. To obtain maximum settling time, it
is standard procedure to purify
into the in-use service tank.
1.
True
2.
False
4-40.
What is the settling time for JP-5
per foot of height?
1.
1 hr
2.
6 hr
3.
3 hr
4.
12 hr
4-41.
When underway, JP-5 service tanks
are stripped daily and what other
times?
1.
Every 3 hours
2.
Every 6 hours
3.
Just before use
4.
Just before pulling inport
4.