4-9.
Which of the following fittings is
installed at the lower end of a
sounding tube?
1.
Brass vortex plate
2.
Striker plate
3.
Brass non-vortex plate
4.
Bellmouth fitting
4-10.
Which of the following devices
is/are installed in the tank at the
end of a fill and suction tailpipe?
1.
Splash plate
2.
Nonvortex fitting
3.
Both 1 and 2 above
4.
Striker plate
4-11.
What is the specified fill rate of
JP-5 storage tanks?
1.
500 gpm
2.
200 gpm
3.
300 gpm
4.
400 gpm
4-12.
What tanks are the first to be
emptied when transferring fuel
internally and the last to be
filled when receiving fuel aboard?
1.
Overflow tanks
2.
Service tanks
3.
Contaminated tanks
4.
Peak tanks
4-13.
Where do overflow tanks overflow to
when they are full?
1.
Other overflow tanks
2.
The contaminated tank
3.
Overboard
4.
Bilge sump tank
4-14.
The service tank fill and suction
tailpipes are exactly the same as
the fill and suction tailpipes for
storage tanks.
1.
True
2.
False
4-15.
Each service tank has a
recirculating line installed
horizontally in the opposite end
from the suction tailpipe. How far
off the bottom of the tank is the
recirculating line installed?
1.
12 in.
2.
18 in.
3.
24 in.
4.
26 in.
4-16.
Before you enter any JP-5 tank for
inspection or cleaning, the tank
must be certified safe for entry by
whom?
1.
The below decks CPO
2.
V-4 division LCPO
3.
V-4 division officer
4.
The gas-free engineer
4-17.
The GEM TLI transmitter mounted
vertically within the tank is
comprised of magnetic reed
switches.
At what intervals are
the switches capped into the
transmitter?
1.
1 in.
2.
2 in.
3.
3 in.
4.
4 in.
4-18.
The calibrate potentiometer in the
primary receiver is adjusted to
what amount of power supply output?
1.
10 volts ac
2.
10 amps ac
3.
10 volts dc
4.
10 amps dc
4-19.
What operates the tap switches in
the transmitter?
1.
Current in the potentiometer
2.
The cable system
3.
The slosh dampener
4.
A magnet in the float
25