O
Offloading JP-5, 4-71
offloading from service tanks, 4-71
offloading from storage tanks, 4-71
Rotary vane pump-Continued
pressure control valve, 4-15
rotor and shaft assembly, 4-15
theory of operation, 4-15
troubleshooting, 4-16
P
S
Personnel Qualification Standards, 1-4
Pipe patches, 2-14
Planned Maintenance System, 2-35
Pollution control, 4-73
Pressure fueling nozzle, 5-13
Pressure gages, 4-48
Pump couplings, 4-16
falk steelflex, 4-17,
lovejoy, 4-18
rex chain, 4-18
Q
Quality assurance program, 2-36
Quality surveillance, 3-5
limits of contamination, 3-6
samples, 3-11
Quick-disconnect coupling, 5-13
R
Receiving JP-5 aboard ship, 4-62
deballasting and stripping, 4-62
filling sequence, 4-63
internal transfer, 4-63
preparations, 4-63
receiving operation, 4-64
Refractometer, 3-22
Refueling hand signals, 5-18
Relaxation chambers, 7-3
Rotary vane pump, 4-13
cylinder and head assembly, 4-15
maintenance, 4-15
Service system operations, 4-72
Settling and stripping, 4-67
settling period, 4-67
stripping procedure, 4-67
stripping schedule, 4-67
Sounding tanks, 4-60
Spray (flange) shields, 4-27
Storage tanks ashore, 7-5
Surveys, 8-6
T
Tank level indicators, 4-53
Tanks aboard ship, 4-48
contaminated tanks, 4-52
deep centerline tanks, 4-49
double-bottom tanks, 4-49
nest of tanks, 4-51
overflow tank, 4-51
peak tanks, 4-49
service tank, 4-49
storage tank, 4-49
wing tanks, 4-48
Technical/maintenance manuals, 8-1
Tools, 2-1
hand tools, 2-1
portable power tools, 2-22
precision measuring tools, 2-23
Transfer lines ashore, 7-5
Transfer system operations, 4-68
consolidating fuel, 4-70
INDEX-3