Which of the following forms is
used to submit the Discrepancy in
Shipment Report?
1.
DD Form 1149
2.
NAVSUP Form 1250
3.
Standard Form 364
4.
Standard Form 361
In processing receipts, the
storeroom AK initials and puts the
stowage date on what block of the
DD Form 1348-1?
1.
9
2.
5
3. BB
4. AA
The material turned-in to store
(MTIS) is primarily used to process
receipts of material with what
condition code?
1.
J
2. H
3. F
4. A
Before sending to screening, how
many copies of DD Form 1348-1 are
attached to the MTIS material?
1 .
2 .
3 .
4 .
1. One
2.
Two
3.
Three
4.
Four
Ashore, MTIS material that cannot
be positively identified as scrap
must be referred to what official
for final determination?
1.
Commanding officer
2.
Inventory control officer
3.
Maintenance officer
4.
D i s p o s a l o f f i c er
Material transfers to DRMO that are
authorized by the item manager are
assigned what disposal authority
code ?
1. M
2. N
3.
0
4. P
The Navy material returns program
is described in which of the
following NAVSUP publications?
1.
1.
P-545
2.
P-484
3.
P-437
3-45.
3-46.
3-47.
3-48.
3-49.
3-50.
What minimum number of copies of DD
Form 1348-1 must accompany the
material that is transferred to (a)
DRMO or (b) stock storage?
1.
(a) 1
(b) 1
2.
(a) 2
(b) 3
3.
(a) 3
(b) 2
4.
(a) 3
(b) 1
When processing repairable MTIS,
shore activities should provide
additional packaging for which of
the
1.
2.
3.
4.
following situations?
When the need is indicated in
the transfer document
When the container used does
not provide proper protection
Only when temporary packing is
provided to the material
All of the above
Repairable MTIS that is categorized
as a critical item is assigned
transportation priority one and
what associated code?
Blue stripe
Red
stripe
White stripe
Green stripe
Which of the following officials is
directly responsible for the entire
material receiving process afloat?
1.
Supply officer
2.
Deck officer
3.
Officer of the deck
4.
Operations officer
Advance planning, coordination, and
scheduling with the shipping
activity and supporting shore
station for required MHE are
prerequisites for which of the
following types of replenishment
a f l o a t?
1.
INREP
2.
UNREP
3.
VERTREP
4.
CONREP
The UNREP/INREP is basically
accomplished in how many processing
steps?
9
2.
7
3.
3
4.
5
4.
P-505