Requested Status Received
Request for Supply Assistance
When the requested status is received, a follow-up
may be submitted after the RDD or SDD has passed.
However, if an ESD has been established, send the
follow-up after the date has passed and adequate
transportation time has expired. The following chart
shows the transportation times considered adequate for
follow-up purposes.
Supply assistance may be requested for priority 1-8
requisitions with a status that reflects an ESD that
material will not be delivered by the RDD or SDD. A
request for supply assistance may be made by message,
letter, or telephone to the proper supply source.
Telephone requests should not exceed seven items, and
should be limited to priority designator 01 through 08.
See figure 4-7 for a sample of a standard supply assist
message format.
REQUISITION MODIFICATION
A requisition modifier may be initiated by the
requisitioner, supplementary addressee, or monitoring
office. The reasons for modifying requisitions include
changes in force/activity designator (FAD) and urgency
of need designator (UND).
Figure 4-7.-MILSTRIP message, supply assistance request.
4-17