6-45.
6-46.
6-47.
6-48.
6-49.
An HMR priority message must be
submitted within a maximum of how many
hours after the discovery of the
discrepancy?
1.
12
2.
24
3.
36
4.
48
An explosive incident is reported in
accordance with what instruction?
1.
OPNAVINST 5100.7
2. OPNAVINST 5215.1
3.
OPNAVINST 8100.3
4. OPNAVINST 8600.2
The term TFOA should be used on an HMR
report that involves which of the following
incidents?
1.
A fuselage panel that falls off an
aircraft while it is in flight
2.
A request is made for technical
information from NADEP
3.
A safety of flight defect is discovered
on a reworked aircraft
4.
An item of material does not conform
to specification requirements
Engineering investigations consist of which
of the following types of actions?
1. Disassembly and inspection
2. Material analysis
3. Engineering assistance
4. Each of the above
Unless combined with an HMR, within
what maximum period of time after you
discover a deficiency must the EI request be
submitted?
1. 24 hours
2.
5 working days
3. 10 working days
4.
30 calendar days
6-50.
What is the purpose of a Quality Deficiency
Report (QDR)?
1.
To improve the quality assurance
inspectors performance
2.
To improve the quality of parts that are
removed for high time
3.
To report deficiencies in quality during
the rework or manufacturing process to
improve the quality of work
4.
To report on the quality of work
performed at the inter- mediate
maintenance level
6-51.
Technical Publication Deficiency Reporting
(TPDR) should NOT be used when you
report deficiencies in which of the
following documents?
1.
Maintenance Requirements Cards
2.
Work Unit Code Manuals
3.
Illustrated Parts Breakdowns
4. OPNAV instructions
6-52.
What activity manages the ADR program?
1. NAVAVNDEPOTOPSCEN
2. COMNAVAIRSYSCOM
3. NATSF
4. OPNAV
6-53.
The requirement for submission of the
initial ADR Form (SF 368) is within how
long after the acceptance flight?
1.
5 working days
2.
10 working days
3.
15 days
4.
30 days
43