ASSIGNMENT 7
Textbook Assignment: "Maintenance and Production Control," Pages 7-1 through 7-23.
7-1.
Actions taken to retain material in a
serviceable condition or to restore it to
serviceability defines which of the
following terms?
1.
Management
2. Production
3.
Maintenance
4.
Inspection
7-2.
Which of the following statements defines
management?
7-3.
1.
The efficient attainment of objectives
2.
The coordination of the departmental
workload
3.
To ensure the entire capability of the
department is utilized
4.
To control the daily workload
Which of the following statements is a
responsibility of maintenance control?
1.
Coordinate and monitor the workload
of the maintenance department
2.
Establish procedures to monitor the
Subsystem Capability and Impact
Report (SCIR)
3.
Validate NMCS/PMCS supply status
listings each day
4.
Each of the above
7-4.
What work center, division, or department
is responsible for establishing procedures
for controlling cannibalization within a
squadron?
1.
Material control
2.
Maintenance control
3.
Supply support center
4.
Aviation support division
7-5.
If you need to perform maintenance on an
aircraft that requires no electrical power,
what must you do?
7-6.
1.
Post someone outside the aircraft to
inform others
2.
Request quality assurance place the
aircraft in a no power status
3.
Request maintenance control place
the aircraft in a no power status
4.
Nothing, just go to work
What is the best tool for ensuring a smooth
flow of maintenance information?
1.
A passdown log
2.
Daily maintenance meetings
3.
Assign an administrative assistant to
the LPO
4. NALCOMIS
7-7.
What report enables supporting
commanders to assess current material
conditions and mission capabilities of
squadron aircraft?
1.
QDR
2. MDR
3. AMRR
4.
TPDR
7-8.
By what means is the Aviation Material
Readiness Report normally submitted?
1.
Naval letter
2.
Unclassified immediate message
3.
Unclassified routine message
4.
Classified immediate message
45