Figure 7-18.Equipment History Record (EHR) card, (OPNAV 4790/113A).
purposes. Then, the ECAMS operator forwards the
copies to the analyst. Copy 3 is filed in maintenance
control, and copy 1 is sent to the data services facility
(DSF) for data entry and the production of various
NAVFLIRS reports. Ensuring the validity of
NAVFLIRS data requires complete coordination
between the analyst, maintenance control, and the
operations department.
AIMD production effort. Production control has the
following responsibilities.
Scheduling the workload, using procedures and
priorities established by the maintenance
material control officer.
Coordinating and controlling the production
effort to ensure efficient movement of
components through the activity.
Maintaining the required files and records to
support the productive effort.
Keeping the maintenance material control
officer informed of overall workload status.
Q33. What system was devised to provide
standardized Department of the Navy flight
activity data collection information?
PRODUCTION CONTROL
LEARNING OBJECTIVE: Identify the
responsibilities of production control.
Production control, like maintenance control of
the organizational maintenance department, is the
nucleus of the AIMD. It is responsible to the
maintenance material control officer for the overall
Maintaining positive control of all accountable
material.
Ensuring maximum use of personnel and
material resources.
Maintaining liaison with the supply department
and the various production work centers.