• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BASIC GTE OPERATION THEORY
Figure 1-8.--Convergent-divergent process.

Gas Turbine Systems Technician (Electrical/Mechanical) 3, Volume 2
Page Navigation
  1    2    3    4    5  6  7    8    9    10    11  
img
Figure 1-7.--Practical demonstration of GTE operations.
1-6


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.