Figure 7-4.Pushing actuating lever down.
3. Remove spring and two spacer pins. Lift
actuating lever assembly with cable inserted in
clevis from housing (fig. 7-5).
4. Thread approximately 5 inches of nylon
cord, MIL-C-5040, through LINKS and tie
both ends together (fig. 7-6).
5. Insert hook of scale into loop of nylon cord
(fig. 7-7).
6. Pull the scale towards aft direction of kit
and in the normal direction of cable operation.
Ensure the adjusting sleeve does not move from
its housing while pull force is exerted. Ensure that
the links and clevis are not pulled from the
housing more than 1/2 inch. Swaged balls should
withstand 100 pounds pull force (fig. 7-8).
Figure 7-5.Removing spring and spacer pins.
Figure 7-6.Tying links together.
Figure 7-7.Attaching scale to nylon loop.
Figure 7-8.Testing swaged ball.
7-5