4-11.
Upon completion of the hard landing
inspection, what record-keeping action is
required to document the completion?
1.
An aircraft logbook entry
2.
An administrative message to the
cognizant wing
3.
An aircraft material readiness report
4.
A RECTYP 79 report
4-12.
After the hard landing inspection MAF is
completed, a signature is posted to the
MAFs ENTRIES REQUIRED
SIGNATURE section. What does the
signature in this section indicate?
1.
Logs and records personnel have
processed the MAF to data services
2.
No further logbook entries are required
or all applicable entries have been
made
3.
All tools and materials required to
complete the job are accounted for
4.
The MAF is correct in its entirety
4-13.
The ENTRIES REQUIRED SIGNATURE
for a NALCOMIS MAF is computer
generated.
1.
True
2.
False
You have been informed that aircraft 160145 is due
for a 14-day inspection. However, due to operational
commitments, the inspection will not be performed
as scheduled and the authorized deviation will be
applied. Another aircraft, aircraft 164864, is due a
100-hour inspection. Due to the same operational
commitments, the 100-hour inspection will be
performed early at 85 hours.
Figure 4-C
IN ANSWERING QUESTIONS 4-14 THROUGH
4-21, REFER TO THE INFORMATION IN
FIGURE 4-C, INFORMATION IN THE
TEXTBOOK, AND INFORMATION IN
REFERENCES DISCUSSED IN THE
TEXTBOOK.
4-14.
4-15.
4-16.
4-17.
What type of inspection is the 14-day
inspection?
1.
Conditional
2.
Daily
3.
Special
4.
Circumstantial
What is the authorized deviation for the 14-
day inspection due on aircraft 160145?
1.
Plus or minus 14 days
2.
Plus or minus 10 days
3.
Plus or minus 7 days
4.
Plus or minus 3 days
On what document should accomplishment
of the 14-day inspection be documented?
1.
Aircraft Inspection and Acceptance
Record
2.
Monthly Maintenance Plan
3.
Maintenance Action Form
4.
Monthly Maintenance Summary
Upon initiation of the 14-day inspection
document, it is placed inside the ADB.
How long should it remain there?
1.
For 10 subsequent flights
2.
Plus or minus 3 days
3.
Until completion of the inspection
4.
6 months from the block B30
completion date
31