4-40.
Upon initiation, the form for the local
manufacture is delivered to the supporting
activity. Who must approve and sign the
form?
1.
The MO
2.
The maintenance control supervisor
only
3.
The production control supervisor only
4.
The maintenance control and
production control supervisors
The Systems Administrator/Analyst has requested
your assistance in preparing this months
maintenance summary.
Figure 4-H
IN ANSWERING QUESTIONS 4-41 THROUGH
4-45, REFER TO THE INFORMATION IN
FIGURE 4-H, INFORMATION IN THE
TEXTBOOK, AND INFORMATION IN
REFERENCES DISCUSSED IN THE
TEXTBOOK.
A. High failure rate items
B. Man-hours that were expended in the repair
of components with no known defect
C. Malfunction of components that caused
flight cancellations
D. Items that have scheduled
removal/replacement schedules and are to
be removed during the month
Figure 4-I
IN ANSWERING QUESTION 4-41, REFER TO
FIGURE 4-I.
4-41.
What items should be included in the
monthly maintenance summary?
4-42.
What report should you use to find the total
number of days a component was in the
repair cycle (turnaround time)?
1.
MDR-3
2.
MDR-9
3.
SCIR 5-2
4.
SCIR 5-3
4-43.
Which of the following malfunction codes,
found in MDR-11, identifies a corrosion
treatment action?
1.
040
2.
170
3.
799
4.
814
4-44.
The number of man-hours that were
expended by maintenance control personnel
in general record keeping is documented on
the MDR-2, MDR-7, and MDR-12.
1.
True
2.
False
4-45.
One page in the maintenance summary
should report subsystem performance and
mission capability. What reporting
subsystem should you use to find this data?
1.
SCIR
2.
MR
3.
MDR
4.
NAVFLIR
Your squadron is currently deployed but is now in
port. You have been asked to assist in preparation of
the Aircraft Material Readiness Report and the
Monthly Aircraft Summary Data report.
Figure 4-J
1.
2.
A and B only
B and C only
3.
A, B, and C only
4.
A, B, C, and D
35