W/C
Command:
Date:
A.
Tear Down/Build-Up/Inflation
of Solid Rim Assembly
SSN:
Name:
Rate/Rank:
W/C Supervisor Indoc Signature:
Date:
C. Tear Down/Build-Up/Inflation
Trainee Initials
Supervisor Signature
Date
1. Required Reading:
of Split Rim Assembly
(applicable sections)
A. OPNAVINST 4790.2
B. OPNAVINST 5100.19, VOL 1
D.
Tear Down/Build-Up/Inflation
Chapters A3, B5, B6, B12
of Demountable Flange Assembly
C. OPNAVINST 5100.23
Chapters 7, 10, 15, 19, 20
E. Tear Down/Build-Up/Inflation
D. NAVAIR 00-80T-96
of SD-2 Spotting Dolly (if applicable)
E. NAVAIR 01-1A-20. para 5-4 a/b
F.
NAVAIR 17-1-123
G. NAVAIR 17-1-125
F.
Use of Bend Breaker (if applicable)
H. NAVAIR 17-1-129
I.
NAVAIR 17-600-174-6-1
J.
NAVAIR 19-1-55
K. Applicable MIMs/MRCs
G.
Use of Inflation Gage
(List each applicable publication)
H.
Trainee Initials
Supervisor Signature
Date
2. Safety Films:
Equipment/Remote Inflator Assembly
Servicing Multi-Piece Wheel
Rims (OSHA A110) (Recommended)
Servicing Single Piece Wheel Assemblies
I.
Documentation Procedures
(OSHA A113) (Recommended)
High Pressure Gases In Aviation
(24795DN) (Required)
Aircraft Tire Maintenance
(25784DN) (Required)
5. Certification: A QAR, certified in tire and wheel maintenance, will sign each area only after th
individual has demonstrated proficiency and awareness of all procedures and safety precautions.
NOTE: All required reading and viewing of video shall be accomplished prior to starting the
tire/wheel maintenance OJT.
A.
Bearing Handling/Lubrication Procedures (if applicable)
3. Completed course of instructions: Nitrogen Servicing Equipment
Signature:
Date:
Phase 1 Completion Date:
Phase II Completion Date:
B.
Tear Down/Build-Up/Inflation of Solid Rim Assembly
4. OJT: A certified technician will sign off/date each area of OJT each time the individual performs a
Signature:
Date:
task under supervision (applicable for A through I).
NOTE: Each OJT area requires a minimum of three tasks for each type assembly.
Signature
Date
A.
Inspection/Handling/Lubrication/
Installation (if applicable)
1
2
C.
Tear Down/Build-Up of Split Rim Assembly
Signature:
Date:
D.
Tear Down/Build-Up/Inflation of Demountable Flange Assembly
Signature:
Date:
E.
Tear Down/Build-Up Fnflation of SD-2 Spotting Dolly Assembly (if applicable)
Signature:
Date:
F.
Use of Bead Breaker (if applicable)
Signature:
Date:
G.
Use of Inflation Gage
Signature:
Date:
H.
Operation of Air Servicing Equipment/Remote Inflator Assembly
Signature:
Date:
I.
Documentation Procedures
Signature:
Date:
WRITTEN TEST SCORE (Minimum 90 percent):
QAR Signature:
Date:
3
ASf02093
Figure 2-93.--Support equipment tire/wheel maintenance requirements.
2-78