Figure 2-23.Change Entry Certification record.
2002 for currency, and a requisition must be prepared
for any changes needed to update the CTPL. Complete
verification and audit requirements are contained in
NAVAIR 00-25-100. The central library audits
dispersed libraries at least quarterly to ensure that their
publications are current and in good material
condition.
Q54.
Q55.
Q56.
Q57.
What division has overall management
responsibility for the technical library?
In an activity with more than one publications
library, who is responsible for determining the
activity's publication needs?
When a central library has other technical
libraries within the command, these libraries are
known as what type of libraries?
What list includes publications and directives of
a general nature that have no application to a
specific weapons system?
Q58.
Q59.
Q60.
Q61.
Q62.
What list includes publications and directives
that apply to a specific weapons system or
equipment?
What is the purpose of the central technical
publications library stamp?
What form does the CTPL use to ensure that
changes and revisions to publications are
incorporated in a timely manner when issued to
a dispersed library?
How long are part 2 copies of the CECR
maintained by the central librarian?
To ensure their publications are current and in
good material condition, the central library
audits dispersed libraries at least how often?
TECHNICAL PUBLICATION
DEFICIENCY REPORT (TPDR)
LEARNING OBJECTIVE: Identify the
procedures used in reporting technical
publication deficiencies.
2-35