Figure 1-7.--MGTE Operating Log.
You should note that the performance of routine or
transfer of an equipment item. The MGTE Inspection
p e r i o d i c inspection requirements of the Planned
Record, shown in figure 1-8, provides for the logging
Maintenance System (PMS) are not recorded on this
and authenticating of the performance of all special and
record.
conditional inspections performed on the equipment.
Figure 1-8.--MGTE Inspection Record.
1-11