both the electrical operating group and in the stage
training newly assigned personnel. To assist
I (EOOW) documentation for maintaining a plot
the space supervisor in the effort, the EOP
of the system alignment.
section provides the following stage II documents:
Diagram for plant steaming conditions
Index pages listing each document by
identification number and title for each specified
in the electrical operating group documentation.
operating group, such as ER, AMR, or electrical
This specifies the preferred electric power
system.
generator combination. This diagram is the same
Space procedure charts (similar to the plant
as that provided in the stage I documentation.
procedure chart) providing the step-by-step
Training diagrams of each major piping
procedures to be accomplished within a space to
system developed for stage I, plus diagrams of
satisfy and support the requirements of the plant
such systems as the fuel-oil service system and the
procedure charts.
main engine lube oil system that are normally
Space status board providing a schematic
located within the machinery spaces.
of major systems and a tabular listing of the
Stage III deals with the system component
major equipment within the individual machinery
level under the supervision of component
spaces for maintaining a plot of system alignments
operators. The component operators place equip-
and equipment operating status. This board is
ment in and out of operation, align systems, and
similar in configuration to the casualty control
monitor and control their operation. This is done
board for the stage I documentation shown in
by manipulating required valves, switches, and
figure 2-14.
controls. Stage III documents include the
D i a g r a m for electrical plant status
following:
delineating generators, switchboards, and
Index pages listing each document by
shorepower connections within the electrical
identification number and title for each specified
distribution systems. This diagram is provided in
Figure 2-14.--Casualty control board.
2-30