C
Carbon dioxide transfer equipment, 3-1 to
3-13
model SC-5, 3-1 to 3-5
installing and servicing new equip-
ment, 3-2 to 3-4
maintenance, 3-4 to 3-5
Walter Kidde transfer unit, 3-5 to 3-13
C O2 cylinders and safety disc, 3-11
components, 3-5 to 3-8
compressor assembly, model 4211
carbon dioxide transfer unit,
3-6
compressor assembly, model
4211-1 carbon dioxide transfer
unit, 3-7
motor, 3-6
multibreaker, 3-6
running gear assembly, 3-7 to 3-8
maintenance, 3-8 to 3-11
cleaning, 3-10 to 3-11
plunger packing, 3-9 to 3-10
safety disc, 3-10
troubleshooting, 3-9
replacing safety discs and washers
on inflation valves, 3-13
service and operational instructions,
3-8
winterizing carbon dioxide cylinders,
3-11 to 3-13
Chamber bleed system, 2-11 to 2-12
Cleaning and oiling, sewing machine, 4-2 to
4-3
Cleaning, test stand 59A120, 1-4 to 1-5
C O2 cylinders and safety disc, 3-11
Components, Walter Kidde transfer unit,
3-5 to 3-8
Compressor assembly, model 4211 carbon
dioxide transfer unit, 3-6
Compressor assembly, model 4211-1 carbon
dioxide transfer unit, 3-7
Control of bleeding, 5-38
Correction card preparation
1-5
Correction cards, 1-5 to 1-8
and calibration,
D
Desert survival, 5-32 to 5-34
Devices and procedures, rescue, 5-20 to 5-23
Differential pressure gage (DF-1), 1-6
Differential system, 2-8 to 2-9
Disassembly and reassembly of the 111 W 155
sewing machine, 4-21 to 4-37
disassembly, 4-21 to 4-27
reassembly, 4-27 to 4-31
E
Exposure, 5-41 to 5-42
F
Fire making, 5-34 to 5-37
Flotation, 5-2 to 5-20
Flow measuring system, 2-12 to 2-13
Foot care, 5-37 to 5-38
Forest penetrator, 5-23 to 5-24
with flotation collar, 5-24
H
Hand signals, 5-29
Health and hygiene, 5-37
Hook, rescue, 5-21
Horse collar (rescue strop), 5-23 to 5-27
I
Installing and servicing new equipment, model
SC-5, 3-1 to 3-5
Intestinal illnesses, 5-37
L
Land survival, 5-30
Life preservers, 5-3 to 5-12
Life rafts, 5-12 to 5 - 20
Linear flow elements (FLM-4), (FLM-3),
(FLM-2), and (FLM-1), 1-7 to 1-8
Liquid oxygen converter test stand 59A120,
1-1 to 1-11
59A120 test stand, the, 1-1 to 1-11
cleaning, 1-4 to 1-5
correction card preparation and cali-
bration, 1-5
correction cards, 1-5 to 1-8
differential pressure gage (DF-1),
1-6
linear flow elements (FLM-4),
(FLM-3), (FLM-2), and
(FLM-1), 1-7 to 1-8
I-2