Liquid oxygen converter test stand
59A120Continued
59A120 test stand, theContinued
correction cards-Continued
low pressure test gage (PG-4),
1-7
test pressure gage (PG-1), 1-6 to
1-7
periodic inspections, 1-1 to 1-4
preparation for use, 1-1
repairing and replacing parts, 1-11
heat exchange panel, 1-11
lubrication, 1-11
troubleshooting, 1-8 to 1-11
bell jar leakage, 1-11
differential pressure gage (DF-1)
indicates low, 1-11
leakage test, accessories section,
1-10
leakage test, test stand, 1-10
PG-1 pointer pegs, 1-10
PG-1 reads low, 1-8 to 1-10
PG-4 indicates low readings
consistently, 1-11
Low pressure test gage (PG-4), 1-7
M
Maintenance, SC-5, 3-4 to 3-5
Maintenance, Walter Kidde transfer unit,
3-8 to 3-11
Model SC-5, 3-1 to 3-5
N
Net, rescue, 5-25 to 5-26
Net, rescue (swimmer assisted, single rescue),
5-26 to 5-27
O
111 W 155 sewing machine, 4-1 to 4-11
Oxygen component test stand (1172AS100),
2-1 to 2-16
periodic inspections, 2-2 to 2-16
altitude sensing system, 2-11
chamber bleed system, 2-11 to 2-12
differential pressure indicating system,
2-8 to 2-9
flow measuring system, 2-12 to 2-13
input, 2-13
output, 2-12
Oxygen component test stand
(117AS100)Continued
pressurizing the altitude sensing
system, 2-11
pressurizing the chamber bleed
system, 2-12
pressurizing the differential pressure
indicating system, 2-9
pressurizing the flow measuring
system, 2-13 to 2-16
pressurizing the regulated high-
pressure system, 2-5 to 2-6
pressurizing the regulated low-
pressure nitrogen system, 2-6 to
2-7
pressurizing the rotameter systems,
2-7 to 2-8
pressurizing the supply nitrogen
system, 2-4
regulated high-pressure system, 2-4 to
2-5
regulated low-pressure nitrogen
system, 2-6
rotameter system, 2-7
safety precautions, 2-2
supply nitrogen system, 2-2 to 2-4
troubleshooting the 1172AS100 test
stand for leaks, 2-2
using the vacuum system, 2-9 to 2-11
vacuum system, 2-9
vent flow system, 2-13
P
Pain, control of, 5-38
Periodic inspections, oxygen component test
stand (117AS100), 2-2 to 2-16
Periodic inspections, test stand 59A120,
1-1 to 1-4
Plunger packing, 3-9 to 3-10
Poisonous snakes, 5-40 to 5-41
Preparation for use, test stand 59A120,
1-1
Preservers life, 5-2 to 5-12
Pressurizing the altitude sensing system, 2-11
Pressurizing the chamber bleed system, 2-12
Pressurizing the differential pressure indicating
system, 2-9
Pressurizing the flow measuring system, 2-13
to 2-16
Pressurizing the regulated high-pressure system,
2-5 to 2-6
Pressurizing the regulated low-pressure
nitrogen system, 2-6 to 2-7
I-3