134.
Who is responsible for initiating
1-40.
the Parachute Configuration
Inspection and History Record?
1.
The manufacturer
2.
The controlling custodians
3.
The IMA placing the parachute
into service
4.
The squadron PR
1-35.
All required entries on a Para-
chute Configuration Inspection
and History Record must be
legibly recorded using
1.
a ball-point pen
2.
a typewriter
3.
either 1 or 2 above
4.
a felt-tip pen
1-36.
Which copy of the parachute
Configuration Inspection and
History Record is filed with the
aircraft logbook?
1.
Hardback copy
2.
Pink copy
3.
Flimsy copy
4.
Yellow copy
137.
Whenever a canopy is inspected
and found to need repairs, what
form is initiated?
1.
A new Parachute Configura-
tion Inspection and History
Record
2.
A canopy Damage Chart
3.
A multlcopy MAF
4.
A NAVAIR-2650
138.
The daily Inspection Of a para-
chute installed in an aircraft
can be performed by which of the
following persons?
1.
A pilot
2.
A plane captain
3.
A line troubleshooter
4.
Line personnel or issue room
custodians found qualified by
the PR and AME shops
1-39.
Only parachutes installed in
air-craft are Subject to a special
(7-day or 14day) inspection.
1.
True
2.
False
1-41.
1-42.
1-43.
1-44.
1-45.
a special inspection must include
the harness used for that
specific parachute inspected.
1.
True
2.
False
If any damage or contamination is
found or suspected while an
inspection is being performed,
who must the Inspector notify?
1.
Line chief
2.
Duality assurance
3.
Work center supervisor
4.
Maintenance control
The original issue inspection on
a parachute assembly is performed
1.
every 14 days
2.
at each postcombat inspection
3.
at the time the assembly is
placed into service
4.
at each calendar/phased
inspection
A parachute has been used in an
emergency situation.
Which
instruction gives you the
procedures to follow to provide
the Naval Weapons Center with
sufficient information to
properly evaluate the parachute?
1.
NAVAIR 4790.2
2.
OPNAV 3750.6
3.
OPNAV 3710.7
4.
NAVAIR 1348
To meet unusual situations or
facilitate workload schedulings
how long can a parachute repack
be delayed?
1.
7 days
2.
10 days
3.
14 days
Which of the following parts of a
parachute assembly are required
to be sent to the Naval Weapons
Center (NWC) after use in an
emergency?
1.
Containers
2.
Harnesses
3.
Automatic parachute ripcord
release assemblies
4.
All of the above
4