3-48
CUT BETWEEN SEIZING
1 INCH APPROXIMATE
UNLAY 3 STRANDS
HEMP CENTER
15 TO 20 TURNS
3/32 DIA. WIRE
TERMINAL
LENGTH
PLUS
1 INCH
STRAND
STRAIGHTENING
TUBE
1 OR 2 TURNS
0.047 DIA. WIRE
ON ALL STRANDS
2 TURNS
3/32 DIA.
WIRE
TERMINAL LENGTH
PLUS 1 INCH
15 OR 20 TURNS
3/32 DIA. WIRE
(A)
(B)
( )
C
(D)
ABEf0347
Figure 3-47.Wire rope preparation.