Mirror, signaling, 5-1 to 5-2
Mk 13, Mod 0 signal flare, 5-2 to 5-3
Mk 79, Mod 0 illumination signal kit, 5-2
Multiplace rafts, pull cable proof load test,
6-3
N
NAMP, Naval Aviation Maintenance Program
forms, 1-22
NES-12 personnel parachute system, 3-1 to
3-15
rigging, 3-4 to 3-15
attachment of container assembly to
riser assembly, 3-12
attachment of firing lanyard to
suspension line connector link,
3-14 to 3-15
external pilot parachute, 3-6 to 3-7
installation of automatic parachute
ripcord release assembly, 3-10 to
3-11
installation of connector link ties,
3-12 to 3-13
installation of release assembly
lanyard and ripcord assembly, 3-13
to 3-14
installation of spreading gun, 3-4 to
3-6
preliminary procedures, 3-4
stowage of firing lanyard into
extractor sleeve, 3-8 to 3-10
straightening canopy gores with
spreader gun installed, 3-8
suspension line continuity check
with spreading gun installed, 3-7 to
3-8
Net, rescue, 5-17 to 5-18
0
One-man life rafts, 6-19 to 6-22
LR-1 life raft assembly, 6-20 to 6-22
LRU-7/P life raft assembly, 6-19 to 6-20
OPNAV 4790/38, preflight/daily/turnaround/
postflight maintenance record, 1-17
OPNAV 4790/101, parachute configuration,
inspection and history record, 1-17 to 1-27
Oscillating type sewing machines, 9-3 to 9-18
Overhand knot, 10-28
Oxygen components test stands, 11-1 to 11-21
liquid oxygen converter test stands, 11-13
to 11-21
cleaning, 11-21
functions, 11-14 to 11-16
bell jar, 11-14 to 11-15
converter supply connection,
NIP-6, 11-15 to 11-16
differential pressure gauge,
DF-1, 11-15
flow of oxygen, 11-16
linear flow elements, 11-16
liquid oxygen quantity gauge
capacitor-type tester, 11-16
relief valve, RV-11, 11-15
maintenance, 11-16 to 11-21
installation, 11-18
test stand leakage tests, 11-18
visual inspection, 11-18
periodic inspections, 11-21
troubleshooting, 11-21
maintenance, 11-10 to 11-13
manometer preparation, 11-10
periodic inspections, 11-12 to 11-13
altitude chamber and suit
simulator tank inward leakage
test, 11-12
biweekly inspection, 11-13
daily inspection, 11-12
monthly inspection, 11-13
weekly inspection, 11-12
pressure/leakage tests, 11-10
leakage control valve(E) and
leakage on/off valve (G) tests,
11-11
outward leakage test (regulated
high-pressure system), 11-11
outward leakage test (regulated
low-pressure system), 11-11
outward leakage test (supply
system), 11-11
suit simulator system leakage
tests, 11-11 to 11-12
Vol-O-Flo calibration, 11-13
Vol-O-Flo element cleaning, 11-13
oxygen, 11-1 to 11-3
characteristics of oxygen, 11-2 to
11-3
effects of hypoxia, 11-2
types of oxygen, 11-3
INDEX-7
