Aircrew personal protective equipment
Continued
types of flight clothing, 4-3 to 4-12
antiexposure assemblies, 4-6 to 4-12
A/P22P-6(V)2 and A/P22P-
6A(V)2 antiexposure assemblies,
4-8 to 4-12
fire-resistant flyers gloves, GS/FRP-2,
4-4 to 4-5
configuration, 4-4 to 4-5
fitting, 4-5
maintenance, 4-5
flyers boot, 4-5
configuration, 4-5 to 4-6
fitting, 4-6
maintenance, 4-6
summer flyers coverall CWU-27/P
and blue flyers coverall CWU-73/P,
4-3 to 4-4
configuration, 4-4
fitting, 4-4
maintenance, 4-4
SV-2 survival vest, 4-6
configuration, 4-6
fittings, 4-6
AN/PRC-63 radio set, 5-5 to 5-7
AN/PRC-90 radio set, 5-7 to 5-10
AN/PRT-5 transmitting set, 5-11 to 5-12
Automatic opening devices, 2-1 to 2-15
automatic parachute actuators, 2-1 to 2-9
arming and assembling the automatic
parachute ripcord release, 2-7 to
2-8
.
automatic parachute ripcord release
test set, 2-5 to 2-6
checkout of armed ripcord release,
2-8 to 2-9
disarming, 2-3
firing altitude check, 2-5
function, 2-2
inspection, 2-4 to 2-5
maintenance, 2-3
preparation for use, 2-2
ripCord release test procedure, 2-6 to
2-7
ballistic spreading gun assembly, 2-9 to
2-15
ballistic spreading gun cartridge
replacement and pull-force check,
2-12 to 2-15
description, 2-10 to 2-11
identification and handling, 2-11
log entries, 2-11
safety precautions, 2-11
service life, 2-11
Automatic opening devicesContinued
ballistic spreading gun assembly
Continued
operation, 2-11
removal of ballistic spreading gun,
2-12
Automatic parachute ripcord release assembly,
installation of, 3-10 to 3-11
Awl, hand tool, 10-12
B
Ballistic spreading gun assembly, 2-9 to 2-15
Ballistic spreading gun inspection, 1-28
Beacon set radio, AN/URT-33A, 5-10 to 5-11
Bell jar, 11-14 to 11-15
Binders knot, 10-29
Bowline knot, 10-29
C
Cable grip, 5-21 to 5-22
Calendar inspection, 12-26 to 12-33
bench test, 12-27
capacitance test (empty), 12-28
capacitance test (full), 12-30 to 12-31
converter assembly purge, 12-27 to 12-28
converter charge, 12-32 to 12-33
converter leakage test, 12-29 to 12-30
evaporation loss test (buildup and supply
mode), 12-31
evaporation loss test (vented mode), 12-31
to 12-32
fill and buildup time test, 12-30
flow test, 12-32
insulation resistance test (empty), 12-28
relief valve test, 12-28 to 12-29
service life, 12-27
visual inspection, 12-27
Calendar/phased/SDLM inspections, 12-9 to
12-18
bench test, 12-9
inward leakage test, 12-9 to 12-18
service life, 12-9
Canopies, 1-6 to 1-10
Canopy damage charts, parachutes, 1-21 to
1-22
Carbon dioxide, 8-1 to 8-5
CO2 recharge equipment, 8-1 to 8-2
CO2 supply cylinders, 8-2
INDEX-2
