Inflatable survival equipmentContinued
multiplace raftsContinued
seam tapes and patches, 6-5 to 6-6
supply pocket, 6-6 to 6-7
topping-off valves, 6-7 to 6-8
one-man life rafts, 6-19 to 6-22
LR-1 life raft assembly, 6-20 to 6-22
ballast bags, 6-21
boarding handles, 6-21
flotation tube, 6-20
inspection, 6-22
oral inflation tube, 6-20 to 6-21
retaining line, 6-21
sea anchor, 6-21
sea anchor pocket, 6-21
securing line, 6-21
survival items, 6-21 to 6-22
weathershield, 6-21
LRU-7/P life raft assembly, 6-19 to
6-20
Inspection, daily/preflight, 12-2 to 12-6
bench test, 12-3 to 12-6
calendar inspections, 12-2
special inspections, 12-2
visual inspection, 12-2 to 12-3
Inspections, 7-3 to 7-9
acceptance/phased/SDLM inspections,
7-4 to 7-8
functional check, 7-7 to 7-8
swaged ball pull test, 7-4 to 7-7
visual inspection, 7-4
purging and charging emergency oxygen
systems, 7-8 to 7-9
Inspections, personnel parachute, 1-14 to 1-16
inspection schedules, 1-16
parachute maintenance, 1-16
reasons for inspecting parachutes, 1-14 to
1-16
specifications, 1-16
Inspections, procedures for preliminary tests,
1-24 to 1-30
Integrated torso harnesses, 4-15 to 4-18
Interlocking slide fasteners, 10-15 to 10-20
K
Kit, seat survival, 7-1 to 7-9
Knife, hand tool, 10-10 to 10-11
Knots, 10-28 to 10-30
binders knot, 10-29
bowline, 10-29
clove hitch, 10-30
half hitch, 10-29 to 10-30
overhand know, 10-28
KnotsContinued
square knot, 10-29
surgeons knot, 10-29
Koch release adapters, harness hardware, 1-13
L
Life preservers, 6-22 to 6-35
Lifeline, rafts, 6-7
Linear flow elements, 11-16
Liquid oxygen converters, 12-18
Liquid oxygen quantity gauge capacitor-type
tester, 11-16
LPP-1/1A life preserver assembly, 6-26
LPU-21/P series life preserver assembly, 6-22
to 6-24
LPU-23/P series life preserver assembly, 6-24
to 6-26
LPU-24/P series life preserver assembly, 6-26
LPU-30/P life preserver assembly, 6-26 to
6-28
LR-1 life raft assembly, 6-20 to 6-22
LRU-7/P life raft assembly, 6-19 to 6-20
LRU-12/A life raft assembly, 6-8 to 6-10
LRU-13/A life raft assembly, 6-10 to 6-13
equipment and survival items, 6-10
packing procedures remote or local pull,
6-10 to 6-13
LRU-14 series life raft assembly, 6-13 to 6-15
equipment and survival items, 6-14 to
6-15
operation, 6-15
LRU-15/A life raft assembly, 6-15 to 6-16
emergency repairs, 6-16
equipment and survival items, 6-16
M
Machine-sewn seams, 10-24 to 10-28
Maintenance, 12-24 to 12-26
acceptance/turnaround/daily/preflight/
postflight and transfer inspections,
12-24
functional test, 12-25 to 12-26
visual inspection, 12-25
Maintenance records and inspection parachute,
1-16 to 1-22
Maintenance scheduling and records, 4-1 to
4-3
maintenance documents, 4-1 to 4-3
modifications of flight equipment, 4-3
Manometer preparation, 11-10
Medical packet, 5-3
INDEX-6