Personnel parachute familiarization
Continued
harness hardwardContinued
inspections, 1-22 to 1-24
acceptance (original issue) calendar/
phased/conditional inspections,
1-22 to 1-24
aircraft accident report inspec-
tion, 1-23 to 1-24
calendar/phased, 1-23
conditional inspection, 1-23
original issue/acceptance, 1-23
postcombat inspection, 1-23
daily inspection, 1-22
special inspection, 1-22
parachute inspection and maintenance
records, 1-16 to 1-22
canopy damage charts, 1-21 to 1-22
Naval Aviation Maintenance Program
forms, 1-22
parachute configuration, inspection
and history record (OPNAV
4790/101), 1-17 to 1-21
cartridges and cartridge-actuated
devices, 1-19
configuration verification (a list
of each item that has a service
life), 1-19 to 1-20
initiation, 1-19
miscellaneous history, 1-19
procedures, 1-20 to 1-21
technical directives, 1-19
preflight/daily/turnaround/postflight
maintenance record (OPNAV
4790/38), 1-17
recording modifications, 1-22
personnel parachute inspections, 1-14 to
1-16
inspection schedules, 1-16
parachute maintenance, 1-16
reasons for inspecting parachutes,
1-14 to 1-16
specifications, 1-16
procedures for preliminary tests and
inspections, 1-24 to 1-30
ballistic spreading gun inspection,
1-28
canopy inspection, 1-25 to 1-26
connector link inspection, 1-27 to
1-28
container assembly inspection, 1-29
to 1-30
Personnel parachute familiarization
Continued
procedures for preliminary tests and
inspectionsContinued
contamination inspection, 1-24 to
1-25
acid and alkaline contamination,
1-25
other contaminations, 1-25
harness/riser assembly inspection
1-28
harness/riser assembly inspection,
1-28
cross-connector strap inspection,
1-29
hardware inspection, 1-28 to
1-29
inspecting for wear and physical
defects, 1-25
pilot parachute inspection, 1-25
replacement of parachute assemblies
and subassemblies, 1-24
ripcord assembly inspection, 1-29
ripcord handle clip inspection,
1-29
ripcord handle pocket inspection,
1-29
ripcord pull test, 1-24
service life checks, 1-24 .
suspension and vent line inspection,
1-26 to 1-27
transporting parachutes, 1-13 to 1-14
shipping-containers, 1-13 to 1-14
storing, 1-14
Pneumatic rescue hand tool, 5-22 to 5-24
Preservers, life, 6-22 to 6-35
Pressure/leakage tests, 11-10
Pull cable proof load test for multiplace
rafts, 6-3
Purging and charging emergency oxygen
systems, 7-8 to 7-9
R
Rafts, multiplace, 6-5 to 6-8
bulkheads, 6-6
combination supply pocket and bailer,
6-7
inflatable seats, 6-6
lifeline, 6-7
right handles, 6-7
seam tapes and patches, 6-5 to 6-6
supply pocket, 6-6 to 6-7
topping-off valves, 6-7 to 6-8
INDEX-9