L
Launching engine system, 4-3
cylinder covers, 4-15
cylinder expansion and elongation indicators,
4-25
cylinder sealing strips, 4-16
launching cylinders, 4-15
sealing strip anchor and guide, 4-17
sealing strip tensioner, 4-17
shuttle, 4-18
steam piston assembly, 4-18
water-brake cylinders, 4-19
water-brake pressure-sensing switches, 4-21
water-brake pumps, 4-20
List of Effective Pages, 7-2
force revision, 7-2
maintenance index page, 7-3
Lubrication system, 4-27
M
Maintenance log, 7-42
Maintenance requirement description, 7-8
Main hydraulic pumps, 4-33
rotary retraction engine, 4-35
Maintain JBD equipment, 5-13
cleaning, 5-14
hoses, seals, and o-rings, 5-14
standard safety precautions, 5-14
Maintenance procedures, 3-45
Maintenance types, levels, and responsibilities, 6-1
depot maintenance, 6-2
intermediate maintenance, 6-1
organizational maintenance, 6-2
Material control codes, 7-33
Measuring tools, 2-1
rules and tapes, 2-1
Mechanical fingers, 1-46
Metal-cutting tools, 1-9
files, 1-13
hacksaws, 1-11
snips and shears, 1-9
Microfilm/aperture cards, 1-8
MK 2 nose-gear-launch system, 5-15
actuator reset assembly, 5-17
buffer accumulator, 5-18
buffer cylinder, 5-18
guide track, 5-15
shock absorber assembly, 5-20
MK 7 MOD 0 jet blast deflector, 5-2
control system, 5-9
emergency procedures, 5-12
water-cooled panel assembly, 5-4
P
Part number, 7-35
Personal safety equipment, 1-2
belts and straps, 1-2
goggles, 1-2
safety shoes, 1-2
Pipe cutter, 1-43
Pliers, 1-18
duckbill, 1-29
needle-nose, 1-30
side-cutting, 1-29
slipjoint, 1-28
wire-twister, 1-30
wrench, 1-18
PMS maintenance requirement status boards, 6-9
Pneumatic tools, 1-40
clipping hammer, 1-40
impact wrench, 1-41
Power tools, 1-37
disk sander, 1-38
drills, 1-37
impact scalers, 1-40
portable grinders, 1-38
Punches, 1-32
aligning, 1-33
drift, 1-33
hollow shank gasket punch, 1-34
prick, 1-33
Purchase cable, 3-27
Push-button station, 3-9
control valve weight selector indictor circuit, 3-9
deckedge control, 3-9
Q
Quality assurance, 6-13
audits, 6-16
inspector qualifications, 6-15
Quarterly schedule, 7-16
R
Recovery log, 7-43
Repairables, 7-36
Replacing packings, 3-63
general precautions, 3-64
gland installation, 3-59
installing new packings, 3-59
Replacing purchase cable, 3-46
inspecting the terminal, 3-55
preparing and pouring zinc, 3-53
testing the terminal, 3-56
Retracting valve, 3-10
plunger, 3-11
retracting lever, 3-11
valve body, 3-10
valve seat, 3-11
valve stem, 3-11
Retraction system, 4-35
drum assembly, 4-36
screw and traverse carriage, 4-36
S
Schematic diagrams, 1-8
electrical systems, 1-8
piping systems, 1-8
INDEX-2
